How to read the result
You get two numbers, and the gap between them is the point of this calculator.
Cost per total mile spreads every dollar over every mile the tractor drove, loaded and bobtail. It is the number to compare with last year's books or with an industry average.
Cost per loaded mile spreads the same dollars over paid miles only. That is your floor: a load paying less than this per loaded mile loses money on the truck alone, before you pay yourself. For a power only tractor that bobtails to every preloaded trailer, this second number is the one to price against.
The rows underneath split the year into fixed costs, fuel, tires and maintenance, and (if you entered it) driver pay, plus insurance per mile and your bobtail share.
How this is calculated
fixed per year = 12 × (truck payment + primary liability
+ trailer interchange + NTL + other monthly)
+ plates, permits and taxes per year
fuel per year = loaded miles ÷ MPG loaded × diesel price
+ bobtail miles ÷ MPG bobtail × diesel price
running costs = (tires + maintenance + driver pay per mile) × total miles
total per year = fixed + fuel + running costs
cost / total mi = total per year ÷ (loaded miles + bobtail miles)
cost / loaded mi = total per year ÷ loaded miles
Fuel is the one cost that changes with load: a bobtail tractor usually gets better mileage than one pulling 30 tons, so the calculator lets you enter both MPG figures from your own fuel records.
Assumptions and where the numbers come from
- Every default is an example. The payment, premiums, MPG and per-mile costs filled in are round numbers for a used tractor, not averages. Replace each one with your own.
- Industry average for comparison. ATRI's 2026 update of its Operational Costs of Trucking study puts the 2025 average at $2.336 per mile, or $1.854 excluding fuel. ATRI surveys motor carriers of all sizes and its figure includes driver wages and benefits, so set the driver pay field before you compare.
- Insurance is split on purpose. Federal rules set a $750,000 minimum for for-hire general freight (49 CFR 387.9), and many power only programs ask for more plus trailer interchange cover. Whether you also carry non-trucking liability depends on your setup; enter 0 if you do not.
- Plates and permits. IRP plates, UCR and state permits vary by state and fleet size. If your tractor is at 55,000 lb taxable gross or more, the federal heavy vehicle use tax (IRS Form 2290) belongs in this line too.
How to use it before you book or sign
- Fill it in once from last year's numbers. It works in a phone browser, so there is no trucking cost per mile calculator app to install.
- Write the cost per loaded mile on the dash. Any rate con under it needs a reason (a reload out of a strong market, a backhaul home).
- Bring the bobtail share down. Cutting bobtail miles from 25% to 15% of the total lowers cost per loaded mile with no change to the truck.
- Do not forget time. A tractor sitting at a gate still costs money per hour; the yard wait cost calculator puts a number on it.
- Damage claims on someone else's trailer can wipe out a month of margin. Walk every trailer with the pre-trip and trailer condition (EIR) checklist before you leave the yard.
Our power only dispatch service books loads against your cost per loaded mile and plans reloads so bobtail miles stay low. The dispatch fee itself is a percentage of gross, from 4% to 6% depending on your fee tier. If the math works, apply here.
Estimates for planning, not tax, insurance or financial advice.