Skip to content
PoweronlyDispatchersApply
PDFFree · no email needed

Preloaded Flatbed Re-Check Sheet

A flatbed securement recheck log for power only drivers who hook a flatbed or step deck that someone else loaded and strapped. The load is yours the moment you pull out, so the sheet walks you through counting the tiedowns at pickup, then logs every re-check on the schedule in 49 CFR 392.9.

Updated · File v1.0 · PowerOnlyDispatchers Dispatch Desk

What is inside

  • The re-check schedule boxed at the top: first 50 miles, then every change of duty status, 3 hours or 150 miles
  • An at-pickup checklist: tiedown count, WLL markings, damaged straps and chains, edge protection
  • The 393.110 minimum tiedown count by article length, and the 393.106(d) aggregate WLL rule in plain words
  • A tiedown inventory table: position, type, WLL, direct or over the load, condition
  • Page 2: a re-check log with odometer, reason for the check and what you re-tensioned, plus a problems log
  • Sources and check dates printed on the sheet

Why preloads need their own flatbed securement recheck

On a flatbed you load yourself, you know every strap. On a preload, you know nothing until you count. The shipper's yard crew may have used straps with no WLL tag, a chain with no grade marking, or one strap too few for a 24 ft bundle. Under the rules, the driver who pulls it out of the yard owns the securement from that point. A five-minute count at pickup is where you catch it, while the forklift is still there.

How to use it

  1. At pickup, fill the top lines: trailer, BOL, cargo, weight, longest piece and the odometer.
  2. Count and write every tiedown in the inventory table on page 1: where it is, chain or strap, the WLL on its tag, and whether it runs from the trailer to the cargo or over the load to the other side. Unmarked chain counts as grade 30 under 393.108(d).
  3. Do the two checks in the box. Enough tiedowns for each article's length (393.110), and an aggregate WLL of at least half the cargo weight (393.106(d)). Tiedowns direct to the cargo count at half their WLL; over the load side to side counts at full WLL. If the math fails, call dispatch before you roll, not at the scale.
  4. Re-check on schedule. First stop within 50 miles. After that, each change of duty status, or 3 hours or 150 miles of driving, whichever comes first. One line per check on page 2, with the reason.
  5. Log problems in the box at the bottom of page 2: what moved, what you did, and when you told dispatch.

Where the rules come from

The schedule is 49 CFR 392.9(b). The tiedown count is 49 CFR 393.110, the aggregate WLL rule is 393.106(d), and how to read a tiedown's WLL is 393.108. All were checked against the current eCFR text on the date shown. Commodity-specific rules in 393.116 to 393.136 add requirements for some cargo, so check them when the BOL says coils, logs, lumber, concrete pipe, heavy machinery or similar.

General information, not legal or safety-compliance advice. The full regulation text, your carrier's procedures and the shipper's instructions come first.

Pair it with

A preload with extra re-check stops takes longer than the miles suggest. The loaded vs bobtail day planner shows what the day pays per total mile, and the dispatch cost estimator shows what a dispatcher costs on top. See our fee tiers, go back to the power only dispatch home page, or send a dispatch application.

You check the straps. Our dispatchers handle the rest: asking the broker for the piece count, weight and dimensions before you get there, flagging a preload that needs more chain than you carry, and building the re-check stops into the trip plan.

Questions about this file

How often do you have to re-check a flatbed load?

49 CFR 392.9(b) says inspect the cargo and securement within the first 50 miles, then re-examine it at each change of duty status, or after 3 hours or 150 miles of driving, whichever comes first. The sheet's re-check log has a column for which of those triggered each check.

How many tiedowns does a flatbed load need?

Under 49 CFR 393.110, an article with nothing blocking it in front needs 1 tiedown if it is 5 ft or shorter and 1,100 lb or lighter, 2 if it is 5 ft or shorter and heavier, 2 if it is over 5 ft up to 10 ft, and over 10 ft, 2 plus 1 for every further 10 ft or part of it. An article blocked in front needs 1 per 10 ft. On top of the count, the aggregate working load limit must be at least half the cargo weight (393.106(d)). Commodity rules (coils, lumber, machinery and others) can ask for more.

Does the driver have to re-check a preload someone else secured?

Yes. The 392.9 duties sit with the driver of the vehicle, whoever strapped it. The one exception is a sealed vehicle you were ordered not to open, or a load packed so it cannot practicably be inspected. A flatbed is rarely either.

Sources and check dates

  1. [01]49 CFR 392.9(b) Inspection of cargo, cargo securement devices and systems: Inspect cargo and securement within the first 50 miles; re-examine at each change of duty status, or after 3 hours or 150 miles of driving, whichever comes first (sealed loads ordered not to be opened are excepted)eCFR current as of 2026-10-29 · checked Nov 2, 2026
  2. [02]49 CFR 393.106(d) Aggregate working load limit for tiedowns: Aggregate working load limit of the tiedowns must be at least one-half the weight of the article or group of articles (direct tiedowns count at half their WLL; tiedowns over the cargo from side to side count at full WLL)eCFR current as of 2026-10-29 · checked Nov 2, 2026
  3. [03]49 CFR 393.108(a) and (d) Working load limit of a tiedown: A tiedown's WLL is the lowest WLL of any of its components (including the tensioner) or of its anchor points; unmarked welded steel chain counts as grade 30 proof coileCFR current as of 2026-10-29 · checked Nov 2, 2026
  4. [04]49 CFR 393.110 Minimum number of tiedowns: Without a headerboard or blocking in front: 1 tiedown for an article 5 ft or shorter and 1,100 lb or lighter; 2 for an article 5 ft or shorter over 1,100 lb, or over 5 ft up to 10 ft; over 10 ft, 2 plus 1 for every further 10 ft or fraction. Blocked articles: 1 per 10 ft or fractioneCFR current as of 2026-10-29 · checked Nov 2, 2026

General information, not legal, tax, insurance or financial advice. Check the official source and your own professionals before you act.

Desk is open

Put a dispatcher on your tractor

Apply in about a minute. No setup fee, no contract, 30 days notice to leave. A real dispatcher calls you back.